Construction of Industrial facilities

 

  • Installation of process - electrical and mechanical equipment;
  • Process pipelines;
  • Welding and mechanical works.

 

Current Projects:
  • OJSC «GAZ» - Set of works for CSSK PLA unit.

Completed Projects:
  • OJSC «Mordovcement» - New chamber of clinker milling.
  • OJSC «VMZ»
    Reconstruction of EWPW-4 for pipes (up to 1 420 mm dia) production with anticorrosive coating - 370 thous. tons/year in Vyksa town in Nizhny Novgorod Oblast;
    Secondary open-hearth steel treatment site for the production of railway wheels - 390 thous. tons of steel per year capacity in Vyksa town in Nizhny Novgorod Oblast.
  • CJSC «Izhora Pipe Mill»
    Pipes production complex (up to 1 420 mm dia, 40 mm WT and 18 m length), including stepwise molding press with total weight of 1 700 tons, effort of 6 500 tnf and performance up to 15 tubes per hour using the «Megalift» installation with capacity of up to 540 tons - in 2006.
  • OJSC «Mordovcement»
    New 2 300 tn/d clinker semidry production line;
    Revamp of Vankinskiy career on Alexeyevskoe cement raw materials field.
  • OJSC «Uliyanovskcement»
    Electrostatic precipitator installation 3 429 on revolver furnace cold end No 1.
  • OJSC «GAZ»
    Equipment installation and adjusting for the conveyor production of «Volga Siber» cars with capacity of 65 thous. cars per year in Nizhny Novgorod - in 2008.
  • «UralVagonZavod» scientific industrial corporation PLC
    Special manufacturing reconstruction;
    Off-site utilities construction;
    Industrial water conduit on site No 1.